HeadlinesNews Stand NG

FG approves East, West super grids to raise transmission capacity to 19,000MW

FG approves East, West super grids to raise transmission capacity to 19,000MW
Photo courtesy of Vanguard News · Verified via News Stand NG
Source Attribution: Vanguard News

News Stand NG operates under ethical news aggregation guidelines. Source: Vanguard News. To read the unabridged investigative reporting and full gallery, visit the original publication.

Read Full Story on Vanguard News
AI Executive Briefing
Gemini Flash AI~45s read
The Federal Government has approved the procurement of East and West Super Grids to boost transmission capacity to 19,000MW within two years. This initiative is supported by a major debt repayment of N1.23 trillion to gas suppliers and the clearance of long-stranded power equipment at ports.
Context & Background
  • ✦Nigeria currently faces a significant power sector contradiction where 13,000MW of generation capacity exists, but the transmission network can only wheel 5,000MW.
  • ✦The sector has been plagued by liquidity issues and historical debts to gas suppliers, which have constrained supply and weakened investor confidence.
Key Figures & Named Entities
•Joseph Tegbe, Minister of Power, stated the goal is to build a dependable power system and reduce grid instability.•N1.23 trillion paid out of N3.3 trillion total debt; 19,000MW target capacity; 300+ containers to be cleared.
Outlook & Next Steps
The government is conducting a nationwide technical audit of electricity infrastructure and constructing a new National Control Centre in Osogbo to replace the 64-year-old facility.
Key Takeaways
AI Summary
  • ✦The Federal Government has approved the procurement of East and West Super Grids to increase national electricity transmission capacity from 5,000MW to 19,000MW within two years.
  • ✦The government has paid N1.23 trillion of the N3.3 trillion debt owed to gas suppliers and power sector stakeholders to improve liquidity and restore investor confidence.
  • ✦President Tinubu has ordered the immediate clearance of over 300 containers of electricity equipment that have been stranded at Nigerian ports for up to 20 years.
Key Facts:N1.23 trillion: The Federal Government has paid N1.23 trillion toward the total N3.3 trillion debt owed to gas suppliers and power sector stakeholders.14 to 20 years: Some electricity equipment containers have remained uncleared at Nigerian ports for a period ranging between 14 and 20 years.64 years: The existing National Control Centre in Osogbo has been in operation for 64 years.
Editorial Excerpt

‎The Federal Government on Wednesday said it has approved the commencement of procurement for the proposed East and West Super Grids as part of efforts to strengthen the national electricity network and raise transmission capacity from about 5,000 megawatts to 19,000MW within two years.

Frequently Asked Questions About This Story

Why is the government building the East and West Super Grids?

The grids are designed to strengthen the national electricity backbone, allowing the country to evacuate the 13,000MW of generation capacity that is currently stranded due to transmission limitations.

What is the status of the stranded electricity equipment at the ports?

President Tinubu has directed the Ministry of Power, the Nigerian Ports Authority, and the Nigeria Customs Service to clear over 300 containers, some of which have been stuck for up to 20 years, for inspection and potential deployment.

Related Topics & Entities

More Coverage on This Story